Corrosion Control (Full Day) |
| 0001 |
Measure Structure - to - Electrolyte Potential |
| 0081 |
Install Cathodic Protection Electrical Isolation Devices |
| 0071 |
Inspect or Test Cathodic Protection Electrical Isolation Devices |
| 0101 |
Inspect Rectifier and Obtain Readings |
| 0141 |
Visual Inspection for Atmospheric Corrosion |
| 0151 |
Visual Inspection of Buried Pipe and Components When Exposed |
| 0171 |
Measure External Corrosion |
| 0191 |
Measure Atmospheric Corrosion |
| |
|
| |
Valves (Half Day) |
| 0301 |
Manually Opening and Closing Valves |
| 0331 |
Valve - Visual Inspection and Partial Operation |
| 0341 |
Valve - Preventive Maintenance |
| |
|
| |
Regulating Devices (Full Day) |
| 0381 |
Spring Loaded Pressure Regulating Device |
| 0391 |
Pilot Operated Pressure Regulating Device |
| 0411 |
Spring Loaded Pressure Limiting and Relief Device |
| 0421 |
Pilot Operated Pressure Limiting and Relief Device |
| 1181 |
Installing and Maintaining Customer Pressure Regulating, Limiting and Relief Devices - Large Commercial and Industrial |
| |
|
| |
Pressure Testing (Half Day) |
| 0561 |
Pressure Test - Non-liquid Medium - Test Pressure Less Than 100 psi |
| 0571 |
Pressure Test - Non-liquid Medium - Test Pressure Greater Than or Equal to 100 psi |
| 0591 |
Leak Test at Operating Pressure |
| |
|
| |
Pipeline Repair (Full Day) |
| 0201 |
Visual Inspection of Installed Pipe and Components for Mechanical Damage |
| 0681 |
Joining of Plastic Pipe - Stab Fittings |
| 0711 |
Joining of Pipe - Compression Couplings |
| 0991 |
Coating Application and Repair - Brushed or Rolled |
| 1011 |
External Coating Application and Repair - Wrapped |
| 1041 |
Install Mechanical Clamps and Sleeves - Bolted |
| 1141 |
Squeeze Off Plastic Pipe |
| |
|
| |
Tapping (Half Day) |
| 1101 |
Tapping a Pipeline with a Built-in Cutter |
| |
|
| |
Odorization (Half Day) |
| 1211 |
Odorization - Periodic Sampling |
| 1221 |
Odorization - Odorizer Inspection, Testing, Preventive and Corrective Maintenance |
| |
|
| |
Pipeline Installation (Full Day) |
| 0641 |
Visually Inspect Pipe and Components Prior to Installation |
| 0861 |
Installation of Steel Pipe in a Ditch |
| 0871 |
Installation of Steel Pipe in a Bore |
| 0901 |
Installation of Plastic Pipe in a Ditch |
| 0911 |
Installation of Plastic Pipe in a Bore |
| 0921 |
Installation of Plastic Pipe Plowing/Pull-In |
| 0931 |
Installation of Plastic Pipe by Plowing/Planting |
| 0941 |
Install Tracer Wire |
| 0951 |
Install of Pipe Above Ground |
| 0961 |
Above Ground Supports and Anchors - Inspection, Preventive and Corrective Maintenance |
| 0971 |
Installation and Maintenance of Casing Spacers, Vents and Seals |
| 0981 |
Backfilling |
| |
|
| |
Meter Sets (Full Day) |
| 1161 |
Installation of Customer Meters and Regulators - Residential and Commercial |
| 1171 |
Installing Customer Meters - Large Commercial and Industrial |
| |
|
| |
Leak Investigation (Full Day) |
| 1231 |
Inside Gas Leak Investigation |
| 1241 |
Outside Gas Leak Investigation |
| 1261 |
Walking Gas Leakage Survey |
| |
|
| |
Damage Prevention (Full Day) |
| 1291 |
Locate Underground Pipelines |
| 1301 |
Install and Maintain Pipeline Markers |
| 1321 |
Damage Prevention during Excavation Activities By or On Behalf of the Operator |
| 1331 |
Damage Prevention Inspection during Third Party Excavation or Encroachment Activities as Determined Necessary by Operator |
| |
|
| |
Purging and Abandonment (Half Day) |
| 1201 |
Temporary Isolation of Service Lines and Service Discontinuance |
| 1641 |
Purging with Gas |
| 1651 |
Purging with Air or Inert Gas |
| 1661 |
Isolating, Abandoning and Deactivating Pipeline Facilities |